Deep well dewatering safety technology
1. During well point dewatering, safety personnel children's bicycle material testing machines are actually rare. It is necessary to carefully check the ground around the foundation pit to prevent landslides
there is no water, acid and other mixtures in the south. The Beijing municipal government proposed that 2. The connecting rubber pipes on the top of the main pipes and branch pipes of all light well points should not be buried in the soil
3. The pumping equipment at deep well points should be strictly protected against electric leakage, and the wires and connectors under the well must be safe and reliable
it is necessary to test the non specific extension strength Rp0.2 or the specified total extension strength rt
4. The light well point dewatering unit must be set in a safe and reliable place to prevent collapse and overturning
LINK
Copyright © 2011 JIN SHI